Subfloor Preparation & Adhesive Selection For LVT

This Course Will Include:

  • Identification and Surface Preparation of Backgrounds
  • ARDEX Subfloor Repair Systems
  • Moisture Testing Process
  • Installation of ARDEX Moisture Control Systems
  • ARDEX Subfloor Preparation for LVT Installation
  • ARDEX Adhesive Selection and Application for LVT
  • Lunch, Refreshments and Giveaways included

Upcoming Training Sessions

Back to Top